During an extraordinary event, like the COVID19 pandemic, very rapid changes in consumption profiles and customers behaviors were recorded. This paper investigates the impact of the lockdown on load and production in the distribution system of Terni. From a DSO point of view, no relevant issues were encountered to be faced. The distributed power generation from renewable resources did not affect relevant issues, maintaining the typical annual generation profiles. A domestic consumption increase was replaced by more relevant decrease of industrial processes and commercial activities absorptions. More than 25,000 domestic users increased their consumptions in April 2020 and the overall consumption of domestic customers in March was 1,05 times higher than the 2015 respectively consumption. The power flows at primary substations reveal a relevant electric demand reduction for each point of connection with the high voltage transmission system; especially bar 1 and 2 of the most relevant Terni primary substation, recorded a 15.3% decrease with respect to March 2019, and a 24.25% decrease with respect to April 2019.

A Distribution Network during the 2020 COVID-19 Pandemic

Carere F.;
2020-01-01

Abstract

During an extraordinary event, like the COVID19 pandemic, very rapid changes in consumption profiles and customers behaviors were recorded. This paper investigates the impact of the lockdown on load and production in the distribution system of Terni. From a DSO point of view, no relevant issues were encountered to be faced. The distributed power generation from renewable resources did not affect relevant issues, maintaining the typical annual generation profiles. A domestic consumption increase was replaced by more relevant decrease of industrial processes and commercial activities absorptions. More than 25,000 domestic users increased their consumptions in April 2020 and the overall consumption of domestic customers in March was 1,05 times higher than the 2015 respectively consumption. The power flows at primary substations reveal a relevant electric demand reduction for each point of connection with the high voltage transmission system; especially bar 1 and 2 of the most relevant Terni primary substation, recorded a 15.3% decrease with respect to March 2019, and a 24.25% decrease with respect to April 2019.
2020
978-8-8872-3747-4
distribution system
domestic users
electric demand
lockdown
power flows
File in questo prodotto:
Non ci sono file associati a questo prodotto.

I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.

Utilizza questo identificativo per citare o creare un link a questo documento: https://hdl.handle.net/20.500.12607/46228
 Attenzione

Attenzione! I dati visualizzati non sono stati sottoposti a validazione da parte dell'ateneo

Citazioni
  • ???jsp.display-item.citation.pmc??? ND
social impact